- Customer
- BYME Engineering Limited
-
- Completion Date
- September 2014
-
- Quantity Surveyor
- Turner & Townsend Brechin
-
- Value
- $21,000,000
-
- Form Of Contract
- Sub contractor
-
- Project Manager
- Faithful+Gould
-
- Area
- 20,000 sq ft
-
- Program Duration
- 26 weeks
-
- Architect
- Studio One
-
- ME Engineer
- DSCO Group
Overview
Within Tseung Kwan O datacentre, ISG fitted out two new data halls spanning 20,000 sq. ft. including the installation of raised floor system. Apart from the fit out delivery, ISG also supplied and installed over 300 tonnes of structural steel on the rooftop to support the critical plant infrastructure of Digital Savvis HKG10 expansion project. Special considerations and detailed logistic planning were required, especially for the delivery of steel structures to the rooftop and within a live datacentre environment.