ISG delivers fit out Kempinski Hotel in Dubai
Project

Kempinski Hotel, Mall of the Emirates, Dubai, UAE

A refurb fit for the iconic Kempinski Hotel at Mall of the Emirates
  • Customer
    Majid Al Futtaim
  • Procurement Route
    Competitive Tender
  • Quantity Surveyor
    MLC International
  • Value
    AED 200m
  • Project Manager
    Aukett Fitzroy Robinson
  • Area
    31,500 m2
  • Program Duration
    78 weeks
  • Architect
    Aukett Fitzroy Robinson
  • ME Engineer
    WSP | Parsons Brinckerhoff
ISG delivers fit out Kempinski Hotel in Dubai

Introduction 

As the oldest luxury hotel collection in the world, the Kempinski name is associated with the highest standards of luxury and impeccable personal service. This cherished tradition can be felt throughout the 48,000 m2 Kempinski Hotel Mall of the Emirates, which opened in April 2006, as the first property in the city of Dubai.

ISG refurbished 393 bedrooms, spanning over 339,000 sq ft, and updated external areas at the iconic Kempinski Mall of the Emirates.

Kempinski Hotel Mall of the Emirates

The project

The client wanted to refit all hotel bathrooms and carry out individual makeovers to the bedrooms. We also transformed guest rooms, suites and ski chalets; as well as updating hospitality and leisure spaces.

ISG also carried out a complete refurbishment of the external facades, including installing a brand-new external lighting design. A new outdoor terrace adorned with olive trees and an impressive water feature was also created, turning it into a new dining and bar destination.
ISG delivers fit out Kempinski Hotel in Dubai

The added value

Upgraded reception area, a wood panel remodelled bar complete with a mosaic ceiling and private dining facility, all day dining restaurant, kitchens and 393 bedrooms, including more than 20 suites with balconies on the upper floors, were extensively upgraded. This involved major strip out works in a rolling sequence of floors to maintain the clients programme. In addition, major structural works were undertaken to sheer walls where new meeting rooms were created.

ISG delivers fit out Kempinski Hotel in Dubai

This involved major strip out works in a rolling sequence of floors to maintain the clients programme. In addition, major structural works were undertaken to sheer walls where new meeting rooms were created.

All of the above was undertaken within a logistically challenging, extremely restricted site with a brief from the client that we should be invisible.